Call us toll free: 1-888-220-5551


Ontario Power Generation, Pickering, ON

ontario power

The measure of a successful project lies in achieving a synergy between environmental sustainability and low operating costs. This was the emphasis of the project for the 190,000 square foot, 6 storey OPG Nuclear Support Building. Numerous teams competed along with the CGC Group to exceed minimum energy standards in order to qualify for the Canadian Federal Government Commercial Building Incentive Program (CBIP). The BULLDOGTM Heat Pump yielded significant savings, due to cooling efficiency and the fact that the compressor does not operate while heating. The equipment was placed on the floor in central mechanical rooms, allowing for ease of maintenance and use. This project was a huge success, and received the Canadian Design Build Institute’s First Place Award of Excellence.


Skip to toolbar